News

29
May

ISO 9001:2008 accreditation was obtained. 

23
Apr

The Shire of Dandaragan have engaged River to investigate and design a temporary sewer system for the Jurien Bay Civic Centre. 

17
Feb

River have secured the design and contract administration for a 14 lot subdivision at Serpentine Downs Stage 8.

 

13
Feb

River are now a prequalified consultant on the Water Corporation Developers Engineering Consultant Panel.  

12
Feb

River Engineering have been providing assistance to the Shire of Kulin.  

22
Jan

Over the past 6 months River has developed their Quality Management System.  

06
Jan

 Leeman stormwater drainage for the Shire of Coorow.  

19
Dec

River Engineering are now on the WALGA Panel. 

Privacy Policy | Site designed by Concept Marketing